PERCOLATION TEST IN BOREHOLE

The percolation test, is necessary for the estimation of the absorption rate of the soil for the septic drain field, or for surface water soakaways. Before digging test pits, the PERMEA3 is the instument which will give you the exact idea of K, the permeabiity coefficient of the soil. The K value is given in mm/h or in m/s.

BORE auger HOLES BEFORE DIGGING TEST PITS !

SuDS assessements with SIG PERMEA3
Infiltrometer Permea3
  • No chronometer needed
  • Auger hole of 100 mm diameter
  • Autonomous recording
  • Real time display of the K coefficient during the test
  • Software application included

a hole of DIAM. 100 MM  IS SUFFICIENT TO TEST THE PERMEABILITY

carrying out permeability surveys using the PERMEA3 infiltrometer

In the UK, the determination of the field saturated conductivity Kfs is imposed by the BS627 percolation test. This test is destructive, consists in digging pits, and trenches to simulate the real field conditions of percolation. Testing the permeability with the PERMEA3 only needs auger holes of 100 mm in the field or the garden.

The test must be done at the depth of the projected drainage or soakaway, and repeated to be able to evaluate the variability of the soil permeabiility coefficient. 


Soil permeability coefficient

With the PERMEA3 you will see the stabilisation phase of the soil saturation.

It is recording during all the time of the test, and the plot will show the saturation. It may need hours before the saturation is reached, but as long as you have water in the 25 liter reservoirs, the permeameter has enough battery to last several days.

Soil infiltration tests

The PERMEA3 has 4 memories of 250 points. These memories can be coupled when you think that the test may use up more points like is high permeability conditions.  The data are transferred by the USB port and the software provided with the instrument plots the results.

Soil infiltration tests